Banner Default Image

Blogs in Wind Energy Jobs

Oem Peak Construction Season 1200x600

The Biggest Hiring Mistake OEMs Make During Peak Construction Season

The Reality CheckPeak construction season does not forgive slow hiring.In European wind, the most expensive mistake OEMs make is not usually choosing the wrong turbine model, vessel partner or ins...

Read article
Finland Oand M 1200 X600 Cover

The Nordic Paradox: Why Finland Faces a Shortage of O&M Supervisors

The political rhetoric surrounding Finnish onshore wind has reached a fever pitch. With a favourable permitting environment and vast available landmass, Finland has positioned itself as the power...

Read article
Search by
Search by blog tags